Full bathroom remodel: floor to ceiling. This bathroom had remained untouched (for the most part) since it was built in the 1970s. We stripped wallpaper, replaced rotten wall studs, and rebuilt the whole shower/tub with the addition of a safety bar. The tile was a specialty design that we positioned on the garage floor to the homeowner’s direction, then transferred to the bathroom and cut to fit the space. We installed new quartz countertops, sinks, lights, and a toilet.