Full bathroom remodel. We started this 2nd floor master bathroom project on the tail of mold remediation from a leak in the original construction (hence the hole in the garage ceiling). The client used this chance to build the bathroom of her dreams. We installed a cast-iron clawfoot tub, frameless glass shower (with 84” tall glass!), and a new vanity. We laid the floor tile in a herringbone pattern, and painted every surface. We even braced the floor to accommodate the weight of the cast-iron clawfoot tub.