This commercial breakroom remodel began with a water leak from an ice machine and expanded into a full interior renovation. We handled mold remediation, flooring replacement, wall repairs, paint, and a custom countertop rebuild to restore a clean, durable space for daily use.
Project Overview
This project involved a commercial breakroom remodel in Denton after a water leak caused damage beneath the flooring and surrounding walls. The scope expanded to include remediation, material replacement, and durability upgrades suitable for a high-traffic commercial environment.
Scope of Work
-
Mold remediation and moisture mitigation
-
Removal of damaged flooring and materials
-
Replacement of compromised sheetrock
-
Interior repainting
-
Installation of a commercial-grade epoxy flooring system
-
Custom countertop rebuild for the sink area after base cabinet removal to match the original cabinetry
Challenges and Solutions
The primary challenge was addressing hidden water damage while minimizing disruption to the surrounding facility. Once damaged materials were removed, we rebuilt the space with moisture-resistant finishes and a seamless epoxy floor designed for durability, easy maintenance, and long-term performance in a shared breakroom setting.
Finished Result
The completed breakroom is clean, functional, and built to handle daily use. The new epoxy flooring provides a durable surface, while the rebuilt countertop and refreshed finishes restore both usability and appearance to the space.